Search Resource Library

Awards
Jun 1, 2018
Duke Ellington School of the Arts Theater

Cold-Formed Steel Engineers Institute (CFSEI) honored Duke Ellington School of the Arts Theater sub-system for Design Excellence. Click (and scroll to bottom of page) to View Case Study Video

e-Newsletters
May 22, 2018
Central & Wolfe Campus

Compressed Design-Build schedule. Complex exterior geometry. Bring it on! With that positive approach, Anning-Johnson contracted Radius Track Corporation to help them deliver the compound curving finish specified on the underside of each 4th floor Central & Wolfe bridge.

Awards
May 1, 2018
Courtyard by Marriott River Run

Courtyard by Marriott River Run in Corvallis, OR wins Northwest Wall and Ceiling Bureau’s 2018 Project of the Year in the category of Light-Gauge Steel Framing. Image: Gabe Hurley. Learn More

Awards
May 1, 2018
Frost Museum of Science Aquarium

The Phillip and Patricia Frost Museum of Science Aquarium Façade in Miami Beach, Florida wins the 2018 AWCI's Excellence in Construction Quality Award in the category of Steel Framing. Learn More

Awards
May 1, 2018
York University Station

York University Station Roof project wins a Canadian Roofing Contractors’ Association (CRCA) Award for Workmanship & Innovation. Radius Track provided the sub-system design and fabrication.

e-Newsletters
Apr 5, 2018
Vaughan Metropolitan Centre Station

Roofing contractor Bothwell-Accurate considered the challenges presented by the Vaughan Centre roof and requested that Radius Track Corporation design and fabricate the roof sub-system instead of wood blocking as originally planned... Read Full e-Newsletter

e-Newsletters
Feb 28, 2018
Highway 407 Station

Radius Track Corporation continued its work on the Toronto Transit Commission extension by designing and fabricating the light-gauge roof sub-framing for the Highway 407 Station.

Awards
Jan 24, 2018
Phillip and Patricia Frost Museum of Science

Phillip and Patricia Frost Museum of Science Façade Design Wins ENR 2018 Best of the Best Cultural/Worship Project Award. Learn More

e-Newsletters
Jan 17, 2018
York University Station

Radius Track Scores Curved Roof Framing Hat Trick in Toronto Transit Extension

“Radius Track provided a very clear layout system that we used to set everything – it all fit and was quite amazing.” Trevor McGrath, Estimating Manager Bothwell Accurate Co. Ltd. Read Full eNewsletter

e-Newsletters
Dec 14, 2017
Able Pump Station

Sloping Roof Curves & Becomes East Façade on Able Pump Station – A Heavy Civil Project Read Full eNewsletter

Pages