Radius Track focuses exclusively on developing framing systems for buildings with curved and complex surfaces. See select projects and innovations below.

 

1996

Planet Hollywood | Richmond, VA
Prefabricated and unitized onsite

Timeline-Planet-Hollywood.jpg

2001

Walt Disney® Concert Hall | Los Angeles, CA
1st iconic project; pre-curved framing for acoustic finish


2005

Los Angeles Trade Technical College | Los Angeles, CA
Redetailing for constructability and cost reduction

Timeline-LA-Trade-Tech.jpg

2010

Target Field, Minnesota Twins Stadium | Minneapolis, MN
Displaced structural steel with curved box beams

Timeline-Target-Stadium.jpg

2012

Fulton Transit Center | New York, NY
Curved, unitized panels

Timeline-Fulton-Transit.jpg

2015

Karuna East & West Buildings at One North | Portland, OR
Design Assist from Design Development phase

Timeline-Karuna-One-North.jpg

2016

Faena Forum | Miami, FL
Curved box beam trusses for dome ribs

Timeline-Faena-Forum.jpg

2017

Frost Museum of Science | Miami, FL
Cavity façade system development with team

Timeline-Frost-Museum-Science.jpg

2017

York University Station & Vaughan Metropolitan Centre Station | Toronto, ON Canada
Curved roofing systems

Timeline-Vaughan-Station.jpg

2018

Antonov Auditorium, Brendan Iribe Center | University of Maryland College Park, MD
Complex roof system & doubly curving brick facade

Timeline-University-Maryland.jpg